Buy a L or XL Egg Package, Get a free rotisserie* - Ends Dec 24th - Shop Now

Some ceramic accessory orders are taking longer than usual. Find a local dealer near you.



*Available online and at participating dealers. Nov. 1 - Dec. 24, 2026. Visit BigGreenEgg.com/terms for full terms & conditions.

Cart 0

Sorry, looks like we don't have enough of this product.

Subtotal Free
View cart
Shipping, taxes, and discount codes are calculated at checkout
egggenius

Egg Genius Instructions for Setup, Use, and Care

Let’s Get Your Egg Genius Ready

Before you get started, make sure you have everything that came with your Egg Genius.

Once everything’s here, you’re ready to get connected.

EGG Genius temperature controller: green Wi-Fi control unit with its stainless draft-door adapter and blower, shown at an angle

Egg Genius Controller

EGG Genius additional pit probe: stainless cable with alligator clip and black angled plug

Pit Temperature Probe

Braided replacement meat probe cable for the EGG Genius temperature controller

Meat Temperature Probe

Two square gray metal plates with square cutouts, one small and one large, displayed on a plain white background.

Two (2) Adapter Plates

A black plastic power adapter with a coiled black cable and a small inline connector, photographed on a plain white background.

12 V DC Power Supply

Big Green Egg Engraved Handle

Create Your Account

The Big Green Egg app can be downloaded from the Apple App Store or the Google Play Store. 

Once installed, open the Big Green Egg app and follow the onscreen instructions to create a Big Green Egg account. We’ll ask you to verify your email address before you continue.

Already have a Big Green Egg account? Log in and you’re ready for the next step.

Connect Your Egg Genius

Now let’s connect your Egg Genius to the app and Wi-Fi.

1. Power it up

Connect your Egg Genius controller to a power supply and turn it on. 

2. Add it in the App

From the Home screen of the Big Green Egg app, tap Let's Cook and enter the serial number found on the bottom of the blower.

3. Connect to Wi-Fi

Follow the onscreen instructions to connect your Egg Genius to Wi-Fi and finish setup.

Lighting a Medium Big Green Egg through the draft door with a red-handled Quick Light Kit tool in a Modular Nest

Light the Fire

Load and light your charcoal. Need a refresher? Follow our guide to loading and lighting your Egg.

Stay close while your Egg comes up to temperature. It’s easier to add heat than take it away — and an overheated Egg takes a while to cool down.

When your Egg is 50–75°F below your target temperature, install the Egg Genius. This gives it time to take control and bring your Egg gently up to temperature without overshooting.

Install Your Egg Genius

Install your Egg Genius controller and let it take control of the fire. 

Instruction diagram showing two steps for installing or replacing a curved panel component. Step 1 shows a top-down view with arrows indicating placement of a gray panel over a black section.
Instruction diagram showing two numbered steps, 3 and 4, with line drawings of a curved panel or case component. Step 3 shows the part from above, and step 4 shows a side view with arrows indicating a sliding or peeling action.

1. Install the Adapter Plate

Use the adapter plate that fits your Egg.

Instruction diagram showing how to plug a grill into an outlet, labeled with Power, Pit, and Meat, with a green border and number 1 in the top left.

2. Connect the Probes

Instruction diagram showing an Egg Genius being attached or aligned into a bracket, with a gray mechanical part, dashed green arrows, and a green numbered badge reading 2.
Instruction diagram showing step 3 of a Egg Genius product installation, with a green border and a white background.

3. Attach the Controller

Slide the controller into the adapter plate. Gravity will hold it in place.

Black and white line drawing of a rotary appliance regulator cap with the text 'BIG GREEN EGG' and 'REGULATOR' visible, plus a green pointer line indicating part of the product.

4. Set the rEGGulator Vent Cap

Leave the top vent open just a crack.

Good to know: Your Egg Genius works best when the top vent is almost closed.

Place Your Probes

Correct probe placement gives your Egg Genius the accurate readings it needs to manage your cook.

Keep it low and slow: Egg Genius temperature probes are designed for cooks below 400°F (204°C).

Technical diagram showing a close-up of a circular metal grate or basket with a wire clip attached, inside a labeled box marked 'Pit' with green measurement arrows indicating width.

1. Attach the pit probe

Clip the pit probe to the cooking grid, 2-3 inches from your food. Position it directly above the convEGGtor or Deflector Plate, away from direct flame and high heat.

Black and white line drawing showing a whole chicken on a grill with a probe thermometer inserted into the meat, labeled 'Meat' in the top left.

2. Insert the meat probe

Insert the meat probe into the thickest part of the meat, avoiding bone and gristle.

Set Your Target Temperatures

On the Cook screen in the Egg Genius app, tell your Egg Genius where you want this cook to go.

1. Set target pit temperature

2. Set the target meat temperature

Big Green Egg Engraved Handle

Let It Cook

Close the dome and let your Egg Genius take it from here. Resist the urge to peek — keeping the dome closed helps the temperature stay steady and your cook stay on track.

Remember: If you’re looking, it ain’t cooking.

Your Egg Genius will let you know when your cook is almost done.

After your cook

Remove the probes, controller, and adapter plate.

Caution:

  • Probes and adapter plate will be hot!
  • Wear heat-resistant gloves when removing them. Place them on a heat-safe surface and let them cool completely.
  • Once cool, wipe the probes with a damp sponge or disinfecting wipe.

Probe Care

A little care will keep your probes ready for the next cook.

1. Keep them dry

The probes are not waterproof or dishwasher safe. Never submerge the probes or cables in liquid.

2. Don’t pull on the cables.

Pulling on the cables can separate the probe tips or clips from the cable. Handle them with care.

3. Store them loosely

Loosely coil the probe cables and store them in a cool, dry place without kinks.

Safety Instructions

Read and follow these instructions before using your Egg Genius. Incorrect installation or use could cause injury or property damage.

1. Keep it dry

Use the Egg Genius only in dry, outdoor locations.

When not in use, store the controller indoors in a dry location.

Do not use the controller or power adapter if it has—or may have—been submerged in water.

2. Use the provided power adapter

Power the Egg Genius only with the provided 12 V DC power adapter, certified with SELV/LPS output.

3. Keep it away from children

Do not allow children to play with the Egg Genius. Keep the controller and its components out of their reach.

4. Operate it safely

The Egg Genius is not intended for use by anyone with reduced physical, sensory, or mental capabilities, or without the experience and knowledge needed to operate it safely.

5. Protect it from excessive heat

Do not place or mount the Egg Genius where it will be exposed to excessive heat — from your Big Green Egg or anything else.

Guides